Find Public Works planning documents, technical studies, reports, and more.
0 found in 0 section(s)
  • Simpson Lane Road Bridge Over Yuba River Scour Evaluation – Plan of Action 2020 (PDF 57MB)
  • Waldo Road Over Dry Creek Bridge Replacement-Notice of Preparation (Aug 2022) (PDF 209KB)
  • South Yuba Drainage Area of Benefit
  • South Yuba Drainage Master Plan Study 2012-Part 1
  • South Yuba Drainage Master Plan Study 2012-Part 2
  • South Yuba Drainage Master Plan Study 2012-Part 3
  • South Yuba Drainage Master Plan Study 2012-Part 4
  • South Yuba Drainage Master Plan Study 2012-Part 5
  • TRLIA Levee Fee Nexus Study Update-2021-Final
  • Yuba County Drainage Presentation to BOS-Feb-2023
  • Plumas Lake Specific Plan/North Arboga Study Area Road Fee Nexus Study-Draft Hearing Report
  • Yuba County Parks Master Plan-Final
  • Yuba County Parks Master Plan Appendices-Final
  • Traffic Undulation Program
  • ADA Self Evaluation and Transition Plan 2023 (PDF 18MB)
  • Bikeway Master Plan-Final (PDF 14MB)
  • Bikeway Master Plan-Appendix (PDF 45MB)
  • Bicycle and Pedestrian Mobility Plan-Final Report-2024 (PDF 24MB)
  • Local Roadway Safety Plan - Final (PDF 8MB)
  • Transportation Master Plan 2025-2030-Final (PDF 3MB)
  • Yuba-Sutter Regional Safety Action Plan-Final-January 2026 (PDF 58MB)
  • Yuba-Sutter Regional Safety Action Plan-Resolution Adopting Plan Goal & Vision (PDF 76KB)